Nuclear Energy Programs and the Probability of Pursuit, 1954–2000

Annual Probability of PursuitNumber of Observations
No power reactor operating or under construction 0.20% 5,418 
Power reactor operating or under construction 0.51% 780 
P-value from a chi-square test assessing the difference across the two groups: 0.10. 
Annual Probability of PursuitNumber of Observations
No power reactor operating or under construction 0.20% 5,418 
Power reactor operating or under construction 0.51% 780 
P-value from a chi-square test assessing the difference across the two groups: 0.10. 